Post details: Building a Deck - Part 3

01/12/05

Permalink 04:28:36 am, Categories: Articles, 116 words   English (US)

Building a Deck - Part 3


Shop homedepot.com

Deck 5

2x6 rim joists were attached to the ends of the beams. Angle brackets were installed to provide additional support for the corner joints.

Approximate time: 1-11/2 hours.
-----------------------------------------

Ground Level Deck

Inner 2x6 joists were attached to the beam faces with joist hangers.

Approximate time: 3-5 hours.

------------------------------------------

Ground Level Deck

2x6 decking was installed perpendicular to the joists. Decking was fastened with deck screws. Ends of boards hang over edge of deck and will be trimmed to length after installation.

Approximate time: 11/2-2 hours.

------------------------------------------

Ground Level Deck

A chalk line was snapped to mark a straight cutting line. Decking was trimmed to length with a circular saw.

Approximate time: 1/4-1/2 hour.

Total approximate time for this ground-level deck:
16-24 hours.

Shop homedepot.com

FIND HELP FOR THIS PROJECT

Permalink

Trackback address for this post:

http://homeservices-directory.com/blog/htsrv/trackback.php/34

Comments, Trackbacks, Pingbacks:

No Comments/Trackbacks/Pingbacks for this post yet...

Leave a comment:

Your email address will not be displayed on this site.
Your URL will be displayed.
Allowed XHTML tags: <p, ul, ol, li, dl, dt, dd, address, blockquote, ins, del, a, span, bdo, br, em, strong, dfn, code, samp, kdb, var, cite, abbr, acronym, q, sub, sup, tt, i, b, big, small>
URLs, email, AIM and ICQs will be converted automatically.
Options:
 
(Line breaks become <br />)
(Set cookies for name, email & url)










Click to shop Home Depot.

FREE MAGAZINES!
New Year 120x90


FREE CATALOGS!
Holly Cats Why - 120


EASY LOANS!
LowerMyBills.com

Categories


powered by
b2evolution